revosteevorevosteevo

  1. 1,866 votes
    Vote 0 votes Vote Vote
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      I agree to the terms of service

      You'll receive a confirmation email with a link to create a password (optional).

      Signed in as (Sign out)
      You have left! (?) (thinking…)
      revosteevorevosteevo commented  · 

      also, tax carbon emissions

      revosteevorevosteevo commented  · 

      The national electric grid(s) are remarkably reliable, given their ad-hoc architecture, but there is massive room for efficiency improvements. Support changes to local power provider rate schedules that link utility profits to aggregate demand reduction. Give regional RTOs, and the govt owned BPA and TVA, more tariff flexibility, but grade them on avg wholesale energy and transmission costs.

      revosteevorevosteevo gave this 2 votes  · 
    • 5,990 votes
      Vote 0 votes Vote Vote
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        I agree to the terms of service

        You'll receive a confirmation email with a link to create a password (optional).

        Signed in as (Sign out)
        You have left! (?) (thinking…)
        revosteevorevosteevo gave this 2 votes  · 
      • 302 votes
        Vote 0 votes Vote Vote
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          I agree to the terms of service

          You'll receive a confirmation email with a link to create a password (optional).

          Signed in as (Sign out)
          You have left! (?) (thinking…)
          revosteevorevosteevo gave this 3 votes  · 
          revosteevorevosteevo commented  · 

          This shift is beginning to take place in DoD software already as every level of the command hierarchy is expected to do more with less. Multi-year billion-plus contracts to huge defense contracts have unacceptable levels of failure. Place sensible guidelines on new contract ceilings, make it easier to create funding vehicles, and give preference to fixed cost / IDIQ over Time & Materials.

        • 851 votes
          Vote 0 votes Vote Vote
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            I agree to the terms of service

            You'll receive a confirmation email with a link to create a password (optional).

            Signed in as (Sign out)
            You have left! (?) (thinking…)
            revosteevorevosteevo gave this 3 votes  · 
            revosteevorevosteevo commented  · 

            DARPA is still funding research into next-gen software (semantic web, artificial intelligence) hardware (self-healing chips) and networks (cognitive radio). The most valuable change a new administration could make would be to replace the politically appointed head of DARPA, who the project managers report to (PMs control the purse strings) with a SMALL bipartisan committee along the FCC model.

          Knowledge Base and Helpdesk